Drawing Schedule
DWG Number: Drawing Title: Revision Number: Date Received:
0 Plan and Elevation A 15/04/2018
1 Wall Details B 14/04/2018
2 Foundation Section A 15/04/2018
3 Roof Section D 18/04/2018
4 Roof Detail A 15/04/2018
5 Opening Detail B 18/04/2018
6 Finish Detail E 15/04/2018
7 General Specifications C 16/04/2018
Global Dimensions, Substructure and Roof Take-off
Quantity of Block Work
Structural timber work to construct the roof
Material/Labour Quotation April 2018
Member L-mm W – mm Labour /hr Material € unit Coverage
wallplate0.1 0.075 0.24 9.99 m
Rafters 0.125 0.044 0.18 7.42 m
Collars 0.125 0.044 0.18 7.42 m
Ceiling Joist 0.125 0.044 0.18 7.42 m
Runners 0.1 0.044 0.17 5.95 m
Ties 0.1 0.044 0.17 5.95 m
Noggins 0.125 0.044 0.18 7.42 m
Struts 0.1 0.075 0.24 9.99 m
Ridge 0.225 0.035 0.2 10.57 m
Purlin 0.225 0.1 0.32 29.95 m
Fascia 0.225 0.025 0.24 7.58 m
Soffit bearer 0.05 0.035 0.14 2.43 m
Tilt Fillet 0.2 0.025 0.16 6.75 m
Straps- Wallplate 0.3 4.6 Nr
Straps- Gable 0.32 5.4 Nr
Insulation 0.24 6.4 M2
Bolts 0.14 3.87 Nr
Coverings
Material/Labour Quotation April 2018
Material/Labour Quotation April 2018
Member L-mm W – mm Labour /hr Material € unit Coverage
Wallplate0.1 0.075 0.24 9.99 m
Rafters 0.125 0.044 0.18 7.42 m
C…